SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 13.06.10 is 37928.308 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 13.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

33.025

33.697

33.439

407.247

442.540

449.002

445.388

1636.085

1800.829

1815.519

1800.505

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.018

5.962

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.997

5.954

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.738

5.685

24:00

0:00:00

0:00:00

0:00

7:46

0:00:00

24:00

Unit - 4 

6.009

5.976

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

4.012

3.973

16:43

0:00:00

0:00:00

0:00

7:17

0:00:00

24:00

Unit - 6 

5.923

5.889

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

33.697

33.439

136:43

0:00:00

0:00:00

0:00

7:17

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

355

Max. Dam Level

1495.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

351

Min. Dam Level

1489.15

Wangtoo

1127

5:00

668

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

447

2:00

204

12:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

25

4