NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 12.06.10 is 37894.611 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 12.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

29.785

31.333

31.144

372.098

409.515

415.305

411.949

1600.936

1767.804

1781.822

1767.066

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.064

6.020

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.952

5.922

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

3.828

3.805

16:14

0:00:00

0:00:00

0:00

7:46

0:00:00

24:00

Unit - 4 

6.142

6.117

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.911

5.857

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

3.436

3.423

14:18

0:00:00

0:00:00

0:00

9:42

0:00:00

24:00

 

Total

31.333

31.144

126:32

0:00:00

0:00:00

0:00

17:28

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

331

Max. Dam Level

1495.10

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

326

Min. Dam Level

1484.95

Wangtoo

809

20:00

656

5:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

427

2:00

208

13:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

15

1