SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 11.06.10 is 37863.278 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 11.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

26.782

27.490

27.237

336.949

379.730

383.972

380.805

1565.787

1738.019

1750.489

1735.922

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.070

6.003

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.926

5.877

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

2.473

2.444

10:46

0:00:00

0:00:00

0:00

13:14

0:00:00

24:00

Unit - 4 

6.065

6.026

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

3.708

3.660

14:50

0:00:00

0:00:00

0:00

9:10

0:00:00

24:00

Unit - 6 

3.248

3.227

13:08

0:00:00

0:00:00

0:00

10:52

0:00:00

24:00

 

Total

27.490

27.237

110:44

0:00:00

0:00:00

0:00

33:16

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

307

Max. Dam Level

1494.65

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

286

Min. Dam Level

1482.40

Wangtoo

930

2:00

591

20:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

2064

2:00

178

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

51

1