SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 10.06.10 is 37835.788 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 10.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

30.180

32.378

31.739

31.525

301.800

352.948

356.482

353.568

1530.638

1711.237

1722.999

1708.685

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.033

5.966

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.837

5.797

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

4.863

4.808

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.051

6.042

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

3.137

3.103

13:38

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

5.818

5.809

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

31.739

31.525

131:03

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

337

Max. Dam Level

1487.15

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

331

Min. Dam Level

1482.25

Wangtoo

1048

14:00

795

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1811

5:00

372

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

35

6