SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 08.06.10 is 37767.388 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 08.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

30.180

36.198

36.394

36.032

241.440

284.455

288.082

285.708

1470.278

1642.744

1654.599

1640.825

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.125

6.071

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.116

6.059

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.894

5.830

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.184

6.125

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.954

5.887

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.121

6.060

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.394

36.032

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

374

Max. Dam Level

1493.40

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

379

Min. Dam Level

1491.30

Wangtoo

1063

5:00

752

18:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

2882

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

467

7:00

275

12:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

10

3