SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 04.06.10 is 37625.008 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 04.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

30.180

36.558

36.126

35.945

120.720

143.230

145.702 144.635 1349.558 1501.519 1512.219 1499.752

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.152

6.126

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.073

6.054

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.839

5.804

23:40

0:00:00

0:00:00

0:00

0:00

0:0:00

24:00

Unit - 4 

6.091

6.072

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.866

5.815

23:33

0:00:00

0:00:00

0:00

0:00

0:27:00

24:00

Unit - 6 

6.105

6.074

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.592

36.309

143:13

0:00:00

0:00:00

0:00

0:00

0:47:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

>400

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

376

Min. Dam Level

1493.00

Wangtoo

1896

5:00

1307

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

    Min. TRT Level

N/A

Draft Tube

1101

1:00

485

24:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

18

3