SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 29.07.10 is 39442.092 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 29.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

0.670

0.000

0.000

1019.312

898.194

904.731

897.159

3252.930

3303.164

3329.303

3301.622

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

0.000

0.000

0:00

0:00:00

0:00:00

24:00

0:00

0:00:00

24:00

Unit - 2 

0.000

0.000

0:00

0:00:00

0:00:00

24:00

0:00

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

24:00

0:00

0:00:00

24:00

Unit - 4 

0.000

0.000

0:00

0:00:00

0:00:00

24:00

0:00

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

0:00:00

24:00

0:00

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

24:00

0:00

0:00:00

24:00

 

Total

0.000

0.000

0:00

0:00:00

0:00:00

144:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1492

Max. Dam Level

1473.40

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

0

Min. Dam Level

1465.00

Wangtoo

20397

15:00

7784

5:00

Water Spillage

1411

Max. TRT Level

1009.5

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

81

Min. TRT Level

1009.5

Draft Tube

N/A

N/A

N/A

N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

0