SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 19.07.10 is 39212.309 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 19.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

6.973

6.297

6.240

667.831

669.107

674.948

669.311

2901.449

3074.077

3099.520

3073.774

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

1.205

1.191

4:34

0:00:00

0:00:00

19:26

0:00

0:00:00

24:00

Unit - 2 

1.121

1.111

4:24

0:00:00

0:00:00

19:36

0:00

0:00:00

24:00

Unit - 3 

1.015

1.005

4:13

0:00:00

0:00:00

19:47

0:00

0:00:00

24:00

Unit - 4 

1.031

1.024

4:00

0:00:00

0:00:00

20:00

0:00

0:00:00

24:00

Unit - 5 

1.000

0.990

3:50

0:00:00

0:00:00

20:10

0:00

0:00:00

24:00

Unit - 6 

0.925

0.919

3:32

0:00:00

0:00:00

20:28

0:00

0:00:00

24:00

 

Total

6.297

6.240

24:33

0:00:00

0:00:00

119:27

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1257

Max. Dam Level

1495.30

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

66

Min. Dam Level

1464.65

Wangtoo

7475

9:00

3680

22:00

Water Spillage

1111

Max. TRT Level

SFT

NA

NA

NA

NA

Water utilised for SFT flushing

81

Min. TRT Level

Draft Tube

2483

3:00

1625

1:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

62

20