SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 17.07.10 is 39143.379 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 17.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

34.698

35.299

35.030

597.533

625.007

631.348

626.127

2831.151

3029.977

3055.920

3030.590

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.518

6.453

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

3.276

3.259

12:35

11:25:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.216

6.165

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.432

6.403

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.442

6.371

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.415

6.379

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

35.299

35.030

132:35

11:25:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1069

Max. Dam Level

1495.80

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

368

Min. Dam Level

1494.15

Wangtoo

4571

1:00

2041

0:00

Water Spillage

620

Max. TRT Level

1011.0

SFT

2065

9:00

2065

9:00

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

2495

3:00

1331

1:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA