SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 16.07.10 is 39133.410 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 16.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.179

37.693

37.373

562.384

590.309

596.049

591.097

2796.002

2995.279

3020.621

2995.560

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.328

6.280

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.269

6.226

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.230

6.166

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.333

6.294

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.260

6.189

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.273

6.218

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.693

37.373

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

867

Max. Dam Level

1495.80

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

393

Min. Dam Level

1494.30

Wangtoo

4458

24:00

1159

14:00

Water Spillage

393

Max. TRT Level

1010.0

SFT

970

9:00

970

9:00

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

926

1:00

486

14:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

24

4