SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 15.07.10 is 39095.717 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 15.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.082

37.931

37.577

527.235

553.130

558.356

553.724

2760.853

2958.100

2982.928

2958.187

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.367

6.297

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.336

6.280

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.181

6.117

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.372

6.332

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.321

6.241

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.354

6.310

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.931

37.577

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

820

Max. Dam Level

1495.15

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

395

Min. Dam Level

1492.90

Wangtoo

1451

18:00

1049

2:00

Water Spillage

343

Max. TRT Level

1010.0

SFT

857

9:00

857

9:00

Water utilised for SFT flushing

81

Min. TRT Level

1009.5

Draft Tube

892

21:00

506

8:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

17

6