SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 06.07.10 is 38759.311 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 06.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.141

36.439

36.211

210.894

221.421

221.950

220.137

2444.512

2626.391

2646.522

2624.600

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.200

6.155

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.048

6.018

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.908

5.863

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.107

6.083

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.050

5.995

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.126

6.097

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.439

36.211

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1014

Max. Dam Level

1495.80

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

380

Min. Dam Level

1493.20

Wangtoo

4458

16:00

2570

9:00

Water Spillage

-

Max. TRT Level

1011.5

SFT

857

9:00

857

9:00

Water utilised for SFT flushing

-

Min. TRT Level

Draft Tube

2490

23:00

642

10:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

105

9