SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 28.02.10 is 35819.511 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 28.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.224

7.635

7.436

7.385

149.652

186.816

191.996

190.332

6267.414

6664.094

6722.888

6663.571

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 2 

1.893

1.878

9:15

0:00:00

0:00:00

0:00

14:45

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

2.088

2.077

8:41

0:00:00

0:00:00

0:00

15:19

0:00:00

24:00

Unit - 5 

1.154

1.142

4:36

0:00:00

0:00:00

0:00

19:24

0:00:00

24:00

Unit - 6 

2.301

2.288

9:47

0:00:00

0:00:00

0:00

14:13

0:00:00

24:00

 

Total

7.436

7.385

32:19

0:00:00

24:00:00

0:00

87:41

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

81

Max. Dam Level

1492.45

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1483.45

Wangtoo

155

7:00

128

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

49

20:00

49

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0