SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 27.02.10 is 35812.126 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 27.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.224

7.361

7.310

7.257

144.428

179.181

184.560

182.947

6262.190

6656.459

6715.452

6656.186

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.876

0.868

3:44

0:00:00

0:00:00

0:00

20:16

0:00:00

24:00

Unit - 2 

2.219

2.200

9:25

0:00:00

0:00:00

0:00

14:35

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.773

1.764

8:04

0:00:00

0:00:00

0:00

15:56

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

2.442

2.425

10:22

0:00:00

0:00:00

0:00

13:38

0:00:00

24:00

 

Total

7.310

7.257

31:35

24:00:00

24:00:00

0:00

88:25

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

77

Max. Dam Level

1492.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1481.60

Wangtoo

199

17:00

145

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

68

20:00

68

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0