SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 26.02.10 is 35804.869 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 26.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.224

7.245

7.561

7.487

139.204

171.820

177.250

175.690

6256.966

6649.098

6708.142

6648.929

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.310

1.293

5:30

0:00:00

0:00:00

0:00

18:30

0:00:00

24:00

Unit - 2 

2.971

2.947

12:21

0:00:00

0:00:00

0:00

11:39

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.335

0.333

1:20

0:00:00

0:00:00

0:00

22:40

0:00:00

24:00

Unit - 5 

2.353

2.325

9:45

0:00:00

0:00:00

0:00

14:15

0:00:00

24:00

Unit - 6 

0.592

0.589

2:19

0:00:00

0:00:00

0:00

21:41

0:00:00

24:00

 

Total

7.561

7.487

31:15

24:00:00

24:00:00

0:00

88:45

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

77

Max. Dam Level

1493.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

79

Min. Dam Level

1478.60

Wangtoo

185

17:00

160

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

62

20:00

62

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0