SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 25.02.10 is 35797.382 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 25.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.224

7.208

7.310

7.235

133.980

164.575

169.689

168.203

6251.742

6641.853

6700.581

6641.442

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

3.137

3.102

14:07

0:00:00

0:00:00

0:00

9:53

0:00:00

24:00

Unit - 2 

0.479

0.474

2:01

0:00:00

0:00:00

0:00

21:59

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.263

1.253

5:27

0:00:00

0:00:00

0:00

18:33

0:00:00

24:00

Unit - 5 

1.667

1.649

7:13

0:00:00

0:00:00

0:00

16:47

0:00:00

24:00

Unit - 6 

0.764

0.757

3:13

0:00:00

0:00:00

0:00

20:47

0:00:00

24:00

 

Total

7.310

7.235

32:01

0:00:00

24:00:00

0:00

87:59

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

78

Max. Dam Level

1490.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1480.40

Wangtoo

182

17:00

156

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

#REF!

#REF!

#REF!

#REF!

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

0

N/A

0

N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0