SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 24.02.10 is 35790.147 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 24.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.224

7.113

7.228

7.161

128.756

157.367

162.379

160.968

6246.518

6634.645

6693.271

6634.207

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.083

1.072

4:30

0:00:00

0:00:00

0:00

19:30

0:00:00

24:00

Unit - 2 

1.694

1.675

7:01

0:00:00

0:00:00

0:00

16:59

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.254

1.245

5:03

0:00:00

0:00:00

0:00

18:57

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

3.197

3.169

13:29

0:00:00

0:00:00

0:00

10:31

0:00:00

24:00

 

Total

7.228

7.161

30:03

0:00:00

24:00:00

0:00

65:57

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

80

Max. Dam Level

1493.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

75

Min. Dam Level

1479.10

Wangtoo

166

12:00

147

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

#REF!

#REF!

#REF!

#REF!

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

63

20:00

63

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0