SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 21.02.10 is 35767.654 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 21.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.224

7.124

6.784

6.713

113.084

136.440

139.673

138.475

6230.846

6613.718

6670.565

6611.714

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.861

2.829

12:30

0:00:00

0:00:00

0:00

11:30

0:00:00

24:00

Unit - 2 

3.052

3.022

12:52

0:00:00

0:00:00

0:00

11:08

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

18:45:00

3:28:00

0:00

1:47

0:00:00

1:47

Unit - 4 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 5 

0.871

0.862

3:52

0:00:00

0:00:00

0:00

20:08

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

6.784

6.713

29:14

18:45:00

3:28:00

0:00

92:33

0:00:00

121:47

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

75

Max. Dam Level

1494.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

66

Min. Dam Level

1484.35

Wangtoo

140

17:00

137

12:00

Water Spillage

-

Max. TRT Level

N/A

SFT

#REF!

#REF!

#REF!

#REF!

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

46

20:00

46

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0