SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 20.02.10 is 35760.941 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 20.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

5.975

6.553

6.490

107.860

129.316

132.889

131.762

6225.622

6606.594

6663.781

6605.001

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under Annaul maintenance w.e.f. 00:00 (12/02/10)

Unit - 1 

2.734

2.593

11:36

0:00:00

0:00:00

0:00

12:24

0:00:00

24:00

Unit - 2 

1.996

1.937

8:18

0:00:00

0:00:00

0:00

15:42

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.205

0.203

0:53

0:00:00

0:00:00

0:00

23:07

0:00:00

24:00

Unit - 5 

1.125

1.112

4:37

0:00:00

0:00:00

0:00

19:23

0:00:00

24:00

Unit - 6 

0.493

0.489

1:59

0:00:00

0:00:00

0:00

22:01

0:00:00

24:00

 

Total

6.553

6.334

27:23

24:00:00

0:00:00

0:00

92:37

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

74

Max. Dam Level

1493.55

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

66

Min. Dam Level

1484.40

Wangtoo

168

12:00

146

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

#REF!

#REF!

#REF!

#REF!

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

54

20:00

54

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0