SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 19.02.10 is 35754.451 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 19.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

6.278

6.300

6.245

102.367

123.341

126.336

125.272

6220.129

6600.619

6657.228

6598.511

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under Annaul maintenance w.e.f. 00:00 (12/02/10)

Unit - 1 

2.601

2.576

10:42

0:00:00

0:00:00

0:00

13:18

0:00:00

24:00

Unit - 2 

0.954

0.946

3:57

0:00:00

0:00:00

0:00

20:03

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.041

1.035

4:11

0:00:00

0:00:00

0:00

19:49

0:00:00

24:00

Unit - 5 

1.162

1.150

4:54

0:00:00

0:00:00

0:00

19:06

0:00:00

24:00

Unit - 6 

0.542

0.538

2:05

0:00:00

0:00:00

0:00

21:55

0:00:00

24:00

 

Total

6.300

6.245

25:49

24:00:00

0:00:00

0:00

94:11

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

74

Max. Dam Level

1491.65

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

66

Min. Dam Level

1481.50

Wangtoo

156

17:00

131

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

#REF!

#REF!

#REF!

#REF!

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

54

20:00

54

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0