SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 17.02.10 is 35741.203 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 17.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

7.108

7.237

7.175

91.381

110.279

112.971

112.024

6209.143

6587.557

6643.863

6585.263

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under Annaul maintenance w.e.f. 00:00 (12/02/10)

Unit - 1 

2.001

1.984

9:01

0:00:00

0:00:00

0:00

14:59

0:00:00

24:00

Unit - 2 

2.389

2.368

10:18

0:00:00

0:00:00

0:00

13:42

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.602

0.599

2:29

0:00:00

0:00:00

0:00

21:31

0:00:00

24:00

Unit - 5 

1.959

1.940

8:28

0:00:00

0:00:00

0:00

15:32

0:00:00

24:00

Unit - 6 

0.286

0.284

1:20

0:00:00

0:00:00

0:00

22:40

0:00:00

24:00

 

Total

7.237

7.175

31:36

24:00:00

0:00:00

0:00

88:24

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

73

Max. Dam Level

1494.25

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

-

Min. Dam Level

1481.40

Wangtoo

155

7:00

132

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

30725

12:00

2336

13:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

N/A

#N/A

N/A

#N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0