SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 16.02.10 is 35734.028 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 16.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

7.222

7.539

7.477

85.888

103.171

105.734

104.849

6203.650

6580.449

6636.626

6578.088

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under Annaul maintenance w.e.f. 00:00 (12/02/10)

Unit - 1 

2.256

2.235

9:20

0:00:00

0:00:00

0:00

14:40

0:00:00

24:00

Unit - 2 

1.542

1.528

7:31

0:00:00

0:00:00

0:00

16:29

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.395

1.386

5:55

0:00:00

0:00:00

0:00

18:05

0:00:00

24:00

Unit - 5 

1.400

1.388

5:50

0:00:00

0:00:00

0:00

18:10

0:00:00

24:00

Unit - 6 

0.946

0.940

4:30

0:00:00

0:00:00

0:00

19:30

0:00:00

24:00

 

Total

7.539

7.477

33:06

24:00:00

0:00:00

0:00

86:54

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

77

Max. Dam Level

1495.45

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

-

Min. Dam Level

1485.00

Wangtoo

137

12:00

113

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

N/A

#N/A

N/A

#N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0