SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 15.02.10 is 35726.551 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 15.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

7.317

7.566

7.504

80.395

95.949

98.195

97.372

6198.157

6573.227

6629.087

6570.611

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under MIV maintenance w.e.f. 00:00 (12/02/10)

Unit - 1 

1.926

1.907

8:45

0:00:00

0:00:00

0:00

15:15

0:00:00

24:00

Unit - 2 

2.676

2.652

12:02

0:00:00

0:00:00

0:00

11:58

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.649

0.646

2:42

0:00:00

0:00:00

0:00

21:18

0:00:00

24:00

Unit - 5 

0.077

0.076

0:25

0:00:00

22:31:00

0:00

1:04

0:00:00

1:29

Unit - 6 

2.238

2.223

9:59

0:00:00

0:00:00

0:00

14:01

0:00:00

24:00

 

Total

7.566

7.504

33:53

24:00:00

22:31:00

0:00

63:36

0:00:00

97:29

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

76

Max. Dam Level

1495.30

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

68

Min. Dam Level

1484.90

Wangtoo

159

12:00

129

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

51

20:00

51

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0