SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 13.02.10 is 35711.707 MU
Year 2009-2010 

DAILY GENERATION TRANSMISSION REPORT FOR 13.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

6.296

6.527

6.472

69.409

82.582

83.232

82.528

6187.171

6559.860

6614.124

6555.767

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under MIV maintenance w.e.f. 00:00 (12/01/10)

Unit - 1 

2.033

2.014

8:29

0:00:00

0:00:00

0:00

15:31

0:00:00

24:00

Unit - 2 

2.851

2.825

12:02

0:00:00

0:00:00

0:00

11:58

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.031

1.025

4:17

0:00:00

0:00:00

0:00

19:43

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 6 

0.612

0.608

2:24

0:00:00

0:00:00

0:00

21:36

0:00:00

24:00

 

Total

6.527

6.472

27:12

24:00:00

24:00:00

0:00

68:48

0:00:00

96:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

77

Max. Dam Level

1494.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

68

Min. Dam Level

1488.20

Wangtoo

124

17:00

0

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

57

19:00

57

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0