SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 12.02.10 is 35705.235 MU
Year 2009-2010 

DAILY GENERATION TRANSMISSION REPORT FOR 12.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

5.916

5.865

5.817

63.916

76.286

76.705

76.056

6181.678

6553.564

6607.597

6549.295

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under MIV maintenance w.e.f. 00:00 (12/01/10)

Unit - 1 

1.318

1.306

5:56

0:00:00

0:00:00

0:00

18:04

0:00:00

24:00

Unit - 2 

2.274

2.254

10:44

0:00:00

0:00:00

0:00

13:16

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.586

0.582

2:25

0:00:00

0:00:00

0:00

21:35

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 6 

1.687

1.675

7:11

0:00:00

0:00:00

0:00

16:49

0:00:00

24:00

 

Total

5.865

5.817

26:16

24:00:00

24:00:00

0:00

69:44

0:00:00

96:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

67

Max. Dam Level

1493.15

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

60

Min. Dam Level

1483.40

Wangtoo

180

7:00

162

12:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

57

19:00

57

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0