NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 11.02.10 is 35699.418 MU
Year 2009-2010 

DAILY GENERATION TRANSMISSION REPORT FOR 11.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.493

5.849

5.750

5.706

58.423

70.370

70.840

70.239

6176.185

6547.648

6601.732

6543.478

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under MIV maintenance w.e.f. 00:00 (31/01/10)

Unit - 1 

1.793

1.778

8:44

0:00:00

0:00:00

0:00

15:16

0:00:00

24:00

Unit - 2 

1.793

1.778

8:41

0:00:00

0:00:00

0:00

15:19

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.825

0.820

3:35

0:00:00

0:00:00

0:00

20:25

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 6 

1.339

1.330

6:46

0:00:00

0:00:00

0:00

17:14

0:00:00

24:00

 

Total

5.750

5.706

27:46

24:00:00

24:00:00

0:00

68:14

0:00:00

96:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

62

Max. Dam Level

1490.60

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

60

Min. Dam Level

1480.35

Wangtoo

207

12:00

197

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

55

19:00

55

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0