SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 10.02.10 is 35693.712 MU
Year 2009-2010 

DAILY GENERATION REPORT FOR 10.02.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

5.293

6.220

6.094

6.045

52.930

64.521

65.090

64.533

6170.692

6541.799

6595.982

6537.772

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 U#3 is under MIV maintenance w.e.f. 00:00 (31/01/10)

Unit - 1 

2.393

2.372

10:02

0:00:00

0:00:00

0:00

13:58

0:00:00

24:00

Unit - 2 

1.200

1.189

5:18

0:00:00

0:00:00

0:00

18:42

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

24:00:00

0:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

0.022

0.021

0:09

22:38:00

0:00:00

0:00

1:13

0:00:00

1:22

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 6 

2.479

2.463

11:03

0:00:00

0:00:00

0:00

12:57

0:00:00

24:00

 

Total

6.094

6.045

26:32

46:38:00

24:00:00

0:00

46:50

0:00:00

73:22

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

61

Max. Dam Level

1493.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

63

Min. Dam Level

1481.85

Wangtoo

237

12:00

209

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

88

14:00

62

10:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0