Capacity 60 MW
State/Country Uttarakhand, India
Basin Tons/ Shri Gangabasin
Project Type Reservoir
Type of Dam Barrage
Height of dam 30.5 m
FRL 1267 m
No. of Sliuce Gates NA
Crest Level 1269.5 m
Length/ Dia of DT 210 m/5.5 m x 20m (channel)
No. of Intakes 2
Desilting Chamber Two/ Open, Twin Chamber
No. of Adits 2
Length of HRT 4330, modified horse shoe
Dia of HRT 5.6 m (finished)
Discharge 73.5 Cumecs
Type of Surge Shaft Simple/ Underground
Height of Surge shaft 51.65
Dia 18 Mts
Type of Pressure Shaft Simple
No. of Pressure Shaft(s)/ Penstocks 1/2
Type of Powerhouse Underground
No./ Capacity of generating units 2/30 MW
Type of Turbine/ No. Verticle Francis
Gross Head 96.76 m
Design Head 90.76 m
Length/ dia of TRT/ Tail Race Tunnel 235m/60m x75 Rec open
Energy in 90  % Dependable Year. 265.50 MU
Estimated cost 449.78 Crore
   