Salient Features back
Capacity 775 MW
State/ Country Himachal Pradesh, India
Basin Satluj
Project Type Run of River
Type of Dam Concrete Gravity
Height of dam in mts. 86 mts
FRL 862.90 mts.
Nos. sliuce gates 7
Crest level 866 m
Length/ dia of DT 2680 m/ 10m
No. of intakes 2
Desilting Chambers bypass cum desilting tunnel
No. of Adits 8
Length of HRT 38.13 KM
Dia of HRT 9 m dia circular (twin tunnels) or 11.75m dia circular (single)
Discharge 480 Cumecs
Type of surge Shaft Inclined surge tunnels with expansion galleries
Height of Surge Shaft --
Dia NA
Type of Pressure Shaft 4 Nos. Steel Lined
No. of Pressure Shaft(s)/ Penstocks 4 No.
Type of Powerhouse Under Ground
No./ Capacity of generating units 4/193.75 MW
Type of Turbine/ No. 4 (Four) nos., Francis Turbines
Gross Head 220.9 m
Design Head 181 m
Length/ dia of TRT/ Tail Race Tunnel 454m (Average)/ 9 mts
Energy in 90  % Dependable Year. 3142 MU
Estimated cost 6080 Crore

 

   