| Capacity |
775 MW |
| State/ Country |
Himachal Pradesh, India |
| Basin |
Satluj |
| Project Type |
Run of River |
| Type of Dam |
Concrete Gravity |
| Height of dam in mts. |
86 mts |
| FRL |
862.90 mts. |
| Nos. sliuce gates |
7 |
| Crest level |
866 m |
| Length/ dia of DT |
2680 m/ 10m |
| No. of intakes |
2 |
| Desilting Chambers |
bypass cum desilting tunnel |
| No. of Adits |
8 |
| Length of HRT |
38.13 KM |
| Dia of HRT |
9 m dia circular (twin tunnels) or 11.75m dia circular (single) |
| Discharge |
480 Cumecs |
| Type of surge Shaft |
Inclined surge tunnels with expansion galleries |
| Height of Surge Shaft |
-- |
| Dia |
NA |
| Type of Pressure Shaft |
4 Nos. Steel Lined |
| No. of Pressure Shaft(s)/ Penstocks |
4 No. |
| Type of Powerhouse |
Under Ground |
| No./ Capacity of generating units |
4/193.75 MW |
| Type of Turbine/ No. |
4 (Four) nos., Francis Turbines |
| Gross Head |
220.9 m |
| Design Head |
181 m |
| Length/ dia of TRT/ Tail Race Tunnel |
454m (Average)/ 9 mts |
| Energy in 90 % Dependable Year. |
3142 MU |
| Estimated cost |
6080 Crore |