Choose Language:   Hindi  |  English
 
SEARCH
Home  -  Projects  -  Kholongchu HEP  -  Introduction
 
   Introduction
  Salient Features
  Financing Details
  Important Events
  Progress Report
  Milestones
 
Nathpa Jhakri HEP
Rampur HEP
Luhri HEP
Devsari HEP
Naitwar Mori HEP
Jakhol Sankri HEP
Arun III HEP
Dhaulasidh HEP
Wangchu HEP
Kholongchu HEP
 
introduction back

Kholongchu HEP with the installed capacity of 600 MW on the river Kholongchu in Bhutan will annually generate 2563.87 MU of energy.

The DPR has been submitted to CEA for TEC in March 2011.

 

 

   
 

Copyright © 2007 | Visitor Number:1197265
All rights reserved with SJVN Limited