AGENCIES THAT APPROCHED SJVNL FORr CONSULTANCY SINCE
ITS INCEPTION IN APRIL,2003
|
S.No. |
Name of Agency |
Date of Request |
Estimated Cost (Rs.) |
Scope of Work |
|
1 |
Uttranchal Jal Vidyut Nigam Ltd; Dehradun UJVNL |
Nov/Dec 2003 |
26.60 lac |
Maneri Bhali HEP (Stage-II) – Review of tunnel
design of HRT involving design of tunnel lining
taking into account vertical and horizontal rock
covers, geology and internal/external water
pressures. |
|
April, 2004 |
14.58 lac 25.4 lac
80.31 lac |
a) Design of Butterfly valve house
cavern- Maneri Bhali HEP-Stage II
b)Design and drawing for
i. Emulsifier and cooling water system.
ii Transformer deck slab related works.
iii Gate- Hoisting arrangement and other hydro
mechanical works in HRT upstream of Surge shaft.
c) Design of dam located at River Song near Dehradun
City. |
|
2 |
M/s Patikiri Power Corporation (P) Ltd, New Delhi (PPCL) |
Feb, 2004 |
1176 lac |
Patikiri Hydel Project (16MW) in Distt. MANDI (HP) -
Fixing the precise location of various project
components, preparation of detail construction
drawings and all technical /engineering support
required for successful implementation of the
project etc. |
|
3 |
Consultancy Development Centre (CDC), New Delhi. |
Feb, 2004
Jan, 2005
Jan, 2005 |
|
a) Feasibility studies for hydro-electric projects
in Afghanistan through Afghanistan Reconstruction
Development Services (ARDS), Ministry of Water &
Power. The services include; geological
investigations, topographical mapping, hydrological
studies, first stage environmental and social impact
studies; preliminary and feasibility design of dam,
water ways, power house, transmission facilities,
cost estimates, financial and economic analysis etc.
b) A delegation of Afghanistan visited the Nathpa
Jhakri Project w.e.f. 12.01.05 to 16.01.05. On their
return journey from the project elaborate
discussions were held with them by Director (Civil)
and GM (Consultancy) regarding the expertise of
SJVNL in Hydro Power Sector. Some members of the
visiting Afghanistan team represented Ministry of
Water and Power, Afghanistan as well, who were
apprised of the earlier correspondence in this
regard.
c) CDC, New Delhi informed that it has signed a MOU
with PSDC Malaysia to explore business opportunities
within India and Malaysia. PSDC has indicated that
the consultancy opportunities can be explored by
Indian Consultant /Consultancy Organizations in the
following sectors in Malaysia:
1. Railways
2. Large Hydro Power Projects Ports |
|
4 |
Chhattisgarh State Electricity Board (CSEB) |
Nov. 2004 |
Estimated cost of consultancy for Kotri HEP was 1445
lac.
|
Preparation of DPRs of the following HEP’s in
Chhattisgarh
i) Nugar-I HEP (170MW), Distt. Dantewara
ii) Nugar-II HEP (210MW),Distt. Dantewara.
iii) Kotri HEP (150MW), Distt Bastar
iv) Rehar-I HEP (171 MW), Distt. Sarguja.
Rehar-II HEP (147MW), Distt. Sarguja.
The scope of work
included review of PFRs and preparation of DPRs
including Hydrological studies, power potential,
project components, geological aspects, interstate
aspects, construction planning, cost estimates,
revenue returns benefits from the Project etc. based
on the latest data and information.
Obtaining of TEC from
CEA, Ministry of Power.
All statutory requirements of CEA for issue of TEC. |
|
5 |
Andhra Pradesh Tribal Power Company Ltd. Hyderabad |
April, 2005 |
------ |
4 No. mini Hydel power projects
under Engineering. Procurement and Construction (EPC)
Method on turn key basis.
Accordingly, the case was put up to Management for
advice, It has been decided that in view of the
engineering staff constraints we may not opt for
these projects. |
|
6 |
M/s Shree Maheshwari Hydro-Power Project corp. Ltd.
(SAMPHCL), Mumbai |
May, 2005 |
39.71 lac |
Advisory services / Assistance
to Shree Maheshwari hydro Power Project Corporation
Ltd.
The case was put up to the management and it has
been decided to pend this consultancy job due to
engineering staff constraints |
|
7 |
M/s Himshakti Projects Pvt. Ltd., Gurgaon |
Feb, 2006 |
----- |
Review of DPR, Preparation of tender drawings,
design engineering and supply of construction
drawings for 260 MW Kutehar HEP, Distt. Chamba, H.P.
. |
|
8 |
M/s Intercontinental Consultants and Technocrats
Pvt. Ltd., New Delhi |
March,2006 |
342 lac |
Preparation of Detailed
Feasibility Study and Detailed Project Report (DPR)
for construction of two tunnels at Khadradang and
Pagal Nallah on Hindustan Tibet Road NH-22, Distt.
Kinnaur, H.P. |
|
9 |
M/s ITTINA Energy Pvt. Ltd., Bangalore |
May, 2006 |
---- |
Preparation of Detailed Project Report (DPR)
followed by detailed engineering for 180 MW Bajoli
-Holi Hydro Project |
|
|