AGENCIES THAT APPROCHED SJVNL FORr CONSULTANCY SINCE ITS INCEPTION IN APRIL,2003
 
 S.No. Name of Agency Date of Request Estimated Cost (Rs.) Scope of Work
1 Uttranchal Jal Vidyut Nigam Ltd; Dehradun UJVNL Nov/Dec 2003 26.60 lac Maneri Bhali HEP (Stage-II) – Review of  tunnel design of HRT involving design of tunnel lining taking into account vertical and horizontal rock covers, geology and internal/external water pressures.
April, 2004 14.58 lac

25.4 lac

 

 

 

80.31 lac

a) Design of Butterfly valve house
cavern- Maneri Bhali HEP-Stage II
b)Design and drawing for
i. Emulsifier and cooling water    system.
ii Transformer deck slab related works.
iii Gate- Hoisting arrangement and other hydro mechanical works in HRT upstream of Surge shaft.
c) Design of dam located at River Song near Dehradun City.
2 M/s Patikiri Power Corporation (P) Ltd, New Delhi (PPCL) Feb, 2004 1176 lac Patikiri Hydel Project (16MW) in Distt. MANDI (HP) - Fixing the precise location of various project components, preparation of detail construction drawings and all technical /engineering support required for successful implementation of the project etc.
3 Consultancy Development Centre (CDC), New Delhi. Feb, 2004

 

 

 

 

 

 

 

 

Jan, 2005

 

 

 

 

 

 

Jan, 2005

 

a) Feasibility studies for hydro-electric projects in Afghanistan through Afghanistan Reconstruction Development Services (ARDS), Ministry of Water & Power. The services include; geological investigations, topographical mapping, hydrological studies, first stage environmental and social impact studies; preliminary and feasibility design of dam, water ways, power house, transmission facilities, cost estimates, financial and economic analysis etc.

b) A delegation of Afghanistan visited the Nathpa Jhakri Project w.e.f. 12.01.05 to 16.01.05. On their return journey from the project elaborate discussions were held with them by Director (Civil) and GM (Consultancy) regarding the expertise of SJVNL in Hydro Power Sector. Some members of the visiting Afghanistan team represented Ministry of Water and Power, Afghanistan as well, who were apprised of the earlier correspondence in this regard.

c) CDC, New Delhi informed that it has signed a MOU with PSDC Malaysia to explore business opportunities within India and Malaysia. PSDC has indicated that the consultancy opportunities can be explored by Indian Consultant /Consultancy Organizations in the following sectors in Malaysia:
1. Railways
2. Large Hydro Power Projects Ports

4 Chhattisgarh State Electricity Board (CSEB) Nov. 2004

Estimated cost of consultancy for Kotri HEP was 1445 lac.

 

Preparation of DPRs of the following HEP’s in Chhattisgarh

i) Nugar-I HEP (170MW), Distt. Dantewara
ii) Nugar-II HEP (210MW),Distt. Dantewara.
iii) Kotri HEP (150MW), Distt Bastar
iv) Rehar-I HEP (171 MW), Distt. Sarguja.

Rehar-II HEP (147MW), Distt. Sarguja.

The scope of work included review of PFRs and preparation of DPRs including Hydrological studies, power potential, project components, geological aspects, interstate aspects, construction planning, cost estimates, revenue returns benefits from the Project etc. based on the latest data and information.

Obtaining of TEC from CEA, Ministry of Power.

All statutory requirements of CEA for issue of TEC.
5 Andhra Pradesh Tribal Power Company Ltd. Hyderabad April, 2005 ------

4 No. mini Hydel power projects under Engineering. Procurement and Construction (EPC) Method on turn key basis.

Accordingly, the case was put up to Management for advice, It has been decided that in view of the engineering staff constraints we may not opt for these projects.
6 M/s Shree Maheshwari Hydro-Power Project corp. Ltd. (SAMPHCL), Mumbai May, 2005 39.71 lac

Advisory services / Assistance to Shree Maheshwari hydro Power Project Corporation Ltd.

The case was put up to the management and it has been decided to pend this consultancy job due to engineering staff constraints
7 M/s Himshakti  Projects Pvt. Ltd., Gurgaon Feb, 2006 ----- Review of DPR, Preparation of tender drawings, design engineering and supply of construction drawings for 260 MW Kutehar HEP, Distt. Chamba, H.P. .
8 M/s Intercontinental Consultants and Technocrats Pvt. Ltd., New Delhi

March,2006

342  lac

Preparation of Detailed Feasibility Study and Detailed Project Report (DPR)  for construction of two tunnels at Khadradang and Pagal Nallah on Hindustan Tibet Road NH-22, Distt. Kinnaur, H.P.

9 M/s ITTINA Energy Pvt. Ltd., Bangalore May, 2006 ---- Preparation of Detailed Project Report (DPR)  followed by detailed engineering for 180 MW  Bajoli  -Holi  Hydro Project  

 

   